Building the tree house has continued! Though not today. There was too much
work going on for me to sneak out for a brilliant sunny day that was beckoning
me to do construction. And rain the day before. But over the weekend, lots and
lots of work!
Most of Day 7 was spent doing the walls:
In my mind, I pictured two brothers shoving each other or their friends
against the walls, causing them to burst open and spill precious child cargo all
over the ground. So I wanted them strong. But I also wanted big windows. And, I
wanted the beams to be on the outside rather than the inside, even though I’d
get more support that way. So I added some long beams in between top and bottom,
plus secured several short beams.
It all seemed pretty sturdy, when I was done. The next day, I moved on to try
doing the walls. You’re supposed to overlap the board. I found this a pain — a
pain to measure, to do on my own, plus look:
You got those gaps on the side. I later realized you’re supposed to put a
board running down along the gaps. But heck, I just decided to put the boards
against each other.
That means there are small horizontal gaps where maybe rain might get
through. But I might also seal those in other ways from the inside. Or not. It’s
a treehouse, after all. Mainly, shifting to the boards flat against each other
meant progress was rapid.
Sunday — Day 9 of work — it was time to do steps. I wanted to do these
beautifully crafted steps. Steps, as it turns out, are hard.
In the end, I cut two board and screwed them both together at one end, the
bolted the other ends to the tree. I then put some scrap decking on top:
Not pretty, but they work. Here’s another view, as I’m so happy with them:
I even cut the bottom one a bit to mesh against the tree. In my mind, I have
it that I’ll make even better steps to replace these temporary ones. In reality,
I’ll probably never get back to them
Now that I could climb up, it was time to get the roof frame going. That took
tons of time, though not as much as for the first floor. I’m better with the
jigsaw and doing diagonals now. Once the deck does down, you don’t realize how
much foundation work has been done. So here’s a shot of some of that:
There was great excitement of being able to climb up. Don’t worry. Most of
the time, I had some big board to provide better security than having the kids
wander around those great big holes.
By the end of the day, people were coming over. I had most of the top deck
down but not enough for guests. So it was strictly only for first floor use.
Here’s the dog, getting away from her puppies:
And the real test — tons of kids in the tree house, and no collapse:
Tomorrow, if the sun’s out, I’m likely to decide search news will carry on
without me and get my roof finished.










{ 2 comments… read them below or add one }
Looking really good Danny. Unless you’re planning on installing Central heat and Air – I wouldn’t worry too much about a few gaps. As you said – it is a tree house – in a tree – and there will be all manner of bugs, dirt, leaves, etc. A few extra gaps may be a good thing
Ah, to be young – I’m sure those steps are sturdy, but at my advanced age I would require safety straps and a handrail
Even though it’s not quite finished, I just wanted to say well done; it looks great!
I’ve been following your progress closely and can’t wait to move into a bigger house with my own garden and a big tree so I can build a tree house like this. I guess some kids to enjoy it might help too… so I think I’ll probably wait a few years!